KOR ENG
HSG성동조선

Overview

HSG Sungdong Shipbuilding

HSG Sungdong Shipbuilding

is a leading Korean shipbuilding

and marine company

headquartered in Tongyeong,

South Gyeongsang Province.

Production

Production Capacity

We operate an integrated production system covering cutting and process
ing through block assembly and launching.

Annual CAPA

480,000tons

Annual production capacity (assembly basis)

Vessels Built

267vessels

Cumulative newbuild record across various vessel types

Production Capacity

Vision & Mission

CorporateVision

"To become a new leader
in the shipbuilding
and marine
sector and a pioneering company

in the eco-friendly energy
market,
driven by technology
and innovation."

Infrastructure

State-of-the-Art Facilities

We achieve high-quality shipbuilding production through world-class equipment and infrastructure.

  • 5 Heavy-duty Cranes (incl. 900-ton capacity)
  • 80,000-ton class Floating Dock
  • SPMT for Large Vessel Transfer
  • Integrated process from cutting & processing to block erection & launching
State-of-the-Art Facilities

Production Technology

Production Technology

Leveraging high-efficiency welding technology along with diverse welding techniques, digital welding network infrastructure,
and automation to enhance prod
uctivity and achieve high-quality shipbuilding.

Character Marking Robot Character Marking Robot
Automated Welding Robot Automated Welding Robot
Digital Welding System Digital Welding System
Extension Synchro Welding System Extension Synchro Welding System

Construction Record

Construction Record

We hold major offshore plant achie
vements including Statoil's CAT-J
Jack-up Rig Leg, Chevron's Leg
& Brace Structure,
and Shell's Pont
oon & Column of the Appomattox
FPS.

Pipe Rack

Pipe Rack 1
Pipe Rack 2
Pipe Rack 3

Jack-up RIG Leg

Jack-up RIG Leg 1
Jack-up RIG Leg 2
Jack-up RIG Leg 3
Jack-up RIG Leg 4

Offshore Facilities

Offshore Facilities 1
Offshore Facilities 2
Offshore Facilities 3
Offshore Facilities 4

Pontoon / Column

Pontoon Column 1
Pontoon Column 2
Pontoon Column 3
Pontoon Column 4

WTIV Crane Pedestal

WTIV Crane Pedestal 1
WTIV Crane Pedestal 2
WTIV Crane Pedestal 3
WTIV Crane Pedestal 4

Special Handling Facilities

Special Handling Facilities 1
Special Handling Facilities 2

Column / Stack

Column Stack 1
Column Stack 2